Skip to content.

Stellenangebote

Sections
You are here: Home » Products » Clamps » Pole Tine Clamp
Document Actions
Pole Tine Clamp : Technical drawing

The MEYER pole tine clamp cradles rolls of paper horizontally for loading/unloading vehicles. A pressure relief valve protects the clamp. The integral sideshift positions loads precisely.
  • Additional hydraulics required
    > one
    > two, if sideshift required
  • The unit has an integral sideshift with pressure relief valve
  • An adjustable pressure relief valve is included
  • Hydraulic flow:
    3-2103K - 25 Ltr./min.
    3-2104K - 30 Ltr./min.
    3-2106K - 40 Ltr./min.
    3-2107K - 40 Ltr./min.
    3-2108K - 40 Ltr./min.
    3-2109K - 40 Ltr./min.
    3-2111K - 50 Ltr./min.
    3-2114N - 60 Ltr./min.
    3-2118N - 60 Ltr./min.
  • Other tine dimensions and opening ranges
Additional Cost for:
  • Separate, built-on sideshift
    - ISO II, +/- 100 mm
    - ISO III, +/- 100 mm
    - ISO IV, +/- 100 mm
  • Integral design
    (roller axles, chain anchors and carriage drawings must be supplied)
    - ISO II, +/- 100 mm
    - ISO III, +/- 100 mm
    - ISO IV, +/- 100 mm
  • Load backrest
    Type 7-05xx
  • Quick disconnect lower hooks
    - ISO II
    - ISO III
    - ISO IV
[ Pole Tine Clamp ]
with integral sideshift
Technical drawing


r
-
type
-
Q
kg
LSP
mm
ISO
Kl.
-
kg
-
LSP
A
mm
F
mm
F
mm
K
mm
L
mm
D
mm
C
mm
E
mm
M
kg
[R]
-
a 3-2109K 2500 1200 4 4500 600 1350 410 1720 90 2200 60 177 410 950 » calculate
a 3-2111K 3500 1200 4 6000 600 1500 410 1780 110 2200 65 177 420 1200 » calculate
a 3-2114N 4500 1200 4 8000 600 1500 390 2010 120 2200 70 207 400 1800 » calculate
a 3-2114G 1400 500 2 1600 500 930 460 1690 80 1070 0 173 169 270 » calculate
b 3-2114G 1400 500 2 1600 500 930 460 1690 80 1270 0 206 169 279 » calculate
a 3-2118N 5500 1200 4 10000 600 2000 520 2420 130 2200 80 207 420 2200 » calculate
a 3-2118G 1800 500 2 2000 500 970 520 1850 80 1070 0 171 177 295 » calculate
b 3-2118G 1800 500 2 2000 500 970 520 1850 80 1270 0 202 177 303 » calculate
c 3-2118G 1800 500 2 2000 500 970 520 1850 80 1500 0 240 177 312 » calculate
a 3-2122G 2200 500 2 2500 500 970 520 1850 80 1070 0 167 179 305 » calculate
b 3-2122G 2200 500 2 2500 500 970 520 1850 80 1270 0 198 179 313 » calculate
c 3-2122G 2200 500 2 2500 500 970 520 1850 80 1500 0 235 179 322 » calculate
a 3-2128G 2800 500 3 3000 500 970 490 1820 90 1070 0 185 198 372 » calculate
b 3-2128G 2800 500 3 3000 500 970 490 1820 90 1270 0 215 198 382 » calculate
c 3-2128G 2800 500 3 3000 500 970 490 1820 90 1500 0 255 198 394 » calculate
a 3-2135G 3500 500 3 4000 500 1250 590 2090 100 1070 0 182 216 550 » calculate
b 3-2135G 3500 500 3 4000 500 1250 590 2090 100 1270 0 207 216 562 » calculate
c 3-2135G 3500 500 3 4000 500 1250 590 2090 100 1500 0 240 216 575 » calculate
a 3-2140G 4000 500 3 4500 600 1250 590 2090 100 1070 0 178 218 565 » calculate
b 3-2140G 4000 500 3 4500 600 1250 590 2090 100 1270 0 203 218 577 » calculate
c 3-2140G 4000 500 3 4500 600 1250 590 2090 100 1500 0 235 218 590 » calculate

Residual capacity calculation: click on the line to start the calculation for this specific type